Annual Report to shareholders
Released
Released
Announcement PDF
Castle Minerals Limited
Annual Report 2025
Corporate Directory
ABN 83 116 095 802
Directors
Stephen Stone - Executive Chairman
Matthew Horgan - Non-Executive Director
James Guy - Non-Executive Director (retired on 8 April 2025)
Brian Thomas – Non-Executive Director (appointed on 8 April 2025)
Company Secretary
Jade Styants
Principal Place of Business & Registered Office
Suite 9, 11 Ventnor Avenue
WEST PERTH WA 6005
Phone: (08) 9322 7018
Postal Address
PO Box 437
WEST PERTH WA 6872
Share Register
Automic Pty Ltd
Level 5, 191 St Georges Terrace
PERTH WA 6000
Phone (within Australia):
1300 288 664
Phone (outside Australia):
+61 2 9698 5414
Auditors
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
PERTH WA 6000
Website
www.castleminerals.com
Email
admin@castleminerals.com
Stock Exchange Listing
Castle Minerals Limited shares are listed on the Australian Securities Exchange (ASX code: CDT).
Corporate Governance Statement
www.castleminerals.com/corporategovernance.php
1
Contents
2025 Mineral Resources and Ore Reserves Statement
3
Directors' Report
5
Auditor’s Independence Declaration
19
Consolidated Statement of Profit or Loss and Other Comprehensive Income
20
Consolidated Statement of Financial Position
21
Consolidated Statement of Changes in Equity
22
Consolidated Statement of Cash Flows
23
Notes to the Consolidated Financial Statements
24
Consolidated Entity Disclosure Statement
40
Directors' Declaration
41
Independent Audit Report
42
ASX Additional Information
46
2
2025 Mineral Resources and Ore Reserves Statement
GRAPHITE MINERAL RESOURCE AS AT 30 JUNE 2025
Castle updated its JORC Code (2012) Mineral Resource Estimate at the Kambale Graphite Project on 23 October 2023 as set
out below:
Table 2: Graphite Mineral Resource Estimates (5% TGC cut-off) 1, 3, 4
(1)
(2)
(3)
(4)
Classification
Tonnes (kt)
Contained TGC (kt)
TGC (%)
Indicated
9,556
843
8.8%
Inferred
12,872
1,096
8.5%
TOTAL 2
22,428
1,939
8.6%
TGC = Total Graphitic Carbon
Totals may not add exactly due to rounding.
Full Mineral Resource parameters can be found on Castle’s ASX release dated 23 October 2023 ‘Castle Boosts Kambale Graphite Resource
to 22.4Mt’.
The scientific and technical information in this report that relates to the geology of the deposits and exploration results is based on
information compiled by Mr Stephen Stone, who is Executive Chairman of Castle Minerals Limited. Mr Stone is a Member of the Australian
Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Stone is the Qualified Person overseeing Castle’s exploration projects and has reviewed and approved the disclosure of all scientific or
technical information that relates to the geology of the deposits and exploration.
Information in this report that relates to geological interpretation, exploration activities, graphite mineralisation, Mineral Resources and
results was reviewed by Dr Allan John Parker who is a Member of the Australian Institute of Geoscientists. Dr Parker is an employee of
Palaris Australia Pty Ltd which provides geological consultancy services to Castle. Dr. Parker is also Director of Geosurveys Australia Pty Ltd,
a non-Executive Director of Centrex Limited and was formerly Managing Director of Lincoln Minerals Limited. Dr Parker has sufficient
experience relevant to the styles of mineralisation and to the activities which are being presented to qualify as a Competent Person as
defined by the JORC code, 2012. Dr Parker consents to the release of the information compiled in this announcement in the form and context
in which it appears.
Castle is not aware of any new information or data that materially affects the information presented and that the material assumptions and
technical parameters underpinning the estimates continue to apply and have not materially changed. Castle confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from the original market announcements.
GOVERNANCE AND INTERNAL CONTROLS
This MROR statement has been compiled and reported in accordance with the guidelines of the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (2012 JORC Code). This statement is reviewed and updated
annually in accordance with Section 15 of the 2012 JORC Code. The nominated annual review date for this MROR statement is 30 June
2025. The information in this statement has been extracted from the relevant ASX reports as indicated below in each Mineral Resource
table.
The Mineral Resource estimates listed in this report are subject to Castle’s governance arrangements and internal controls. Estimates
are derived by a Competent Person (CP) with the relevant experience in the style of mineralisation and type of deposit under
consideration, and to the activity which they are undertaking. Geology models in all instances are generated by Castle staff and are
reviewed by the CP. The CP carries out reviews of the quality and suitability of the data underlying the Mineral Resource estimate.
Castle management conducts its own internal review of the estimate to ensure that it honours the Castle geological model and has
been classified and reported in accordance with the JORC Code.
The Company has established practices and procedures to monitor the quality of data applied in Mineral Resource estimation, and to
commission and oversee the work undertaken by external independent consultants. In all cases Mineral Resources are estimated and
reported in accordance with the “Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’ (the JORC
Code).
Castle confirms that all material assumptions underpinning the Mineral Resources and any forecast information continue to apply and
have not materially changed. Further information on Castle Minerals Limited and its Minerals Resources can be found on its website
at www.castleminerals.com which contains copies of all continuous disclosure documents to ASX, Competent Persons’ Statements
and Corporate Governance Statement and Policies.
3
2025 Mineral Resources and Ore Reserves Statement Continued
SCHEDULE OF MINING TENEMENTS AS AT 30 JUNE 2025
Tenement and Name
Interest
WESTERN AUSTRALIA (CASTLE MINERALS LIMITED)
Meekatharra Projects (Gold, Base Metals) 1
E51/1703
Wanganui
100%
E51/1843
Polelle
100%
P51/3190
Polelle North
100%
P51/3191
Polelle North
100%
P51/3192
Polelle North
100%
P51/3193
Polelle North
100%
P51/3194
Polelle North
100%
P51/3195
Polelle North
100%
P51/3196
Polelle North
100%
P51/3197
Polelle North
100%
P51/3198
Polelle North
100%
GHANA
Kambale Graphite Project
2
PL 10/47
Kambale
100%
RL 10/52
Jewoyeli
Application
PL 10/26
Degbiwu
100%
Carlie Mining Gold Projects 2, 3
RL 10/13
PL 10/23
PL 10/25
PL 10/13
PL 10/24
RL 8/27
RL 8/31
Wa
100%
Bulenga
100%
Charingu
Application
Baayiri
Conversion/ Application
Jumo
Application
Kandia
100%
Gbinyiri
Conversion/ Application
(1) Great Boulder Resources Limited (ASX:GBR) holds an option to acquire a 75% interest in the Company’s Meekatharra Project.
(2) Government of Ghana has the right to acquire a 10% free carried interest in all licences and is entitled to a 5% Gross Royalty on
production. All licences are held in 100% owned Ghana based subsidiary, Carlie Mining Limited, other than Kambale (PL10/47)
which is wholly owned by Kambale Graphite Limited.
(3) Carlie Mining Limited has lodged applications to divide certain retention licences into smaller Prospecting Licences, for extensions
to licence terms and/or renewals under the Ghana Mining Act. Having paid and been receipted for all amounts invoiced by Ghana
MINCOM, the Company awaits, in some cases, confirmation of tenure in the form of contracts duly executed by the responsible
Minister.
FORWARD LOOKING STATEMENT
Statements regarding Castle’s plans, forecasts and projections with respect to its mineral properties and programs are forwardlooking statements. There can be no assurance that Castle’s plans for development of its mineral properties will proceed. There
can be no assurance that Castle will be able to confirm the presence of Mineral Resources or Ore Reserves, that any
mineralisation will prove to be economic or that a mine will be successfully developed on any of Castle’s mineral properties. The
performance of Castle may be influenced by a number of factors which are outside the control of the Company, its Directors,
staff or contractors.
4
Directors’ Report
Your directors submit their report on the consolidated entity (referred to hereafter as the “Group”) consisting of Castle Minerals
Limited (“Company”) and the entities it controlled at the end of, or during, the year ended 30 June 2025.
DIRECTORS
The names and details of the Group’s directors in office during the financial year and until the date of this report are as follows.
Where applicable, all current and former directorships held in listed public companies over the last three years have been
detailed below. Directors were in office for this entire period unless otherwise stated.
Stephen Stone, BSc (Hons) Mining Geology, MAusIMM, FAICD, (Executive Chairman).
Mr Stone graduated with honours in Mining Geology from University of Wales, Cardiff in 1978 and then spent several years at
the large underground copper mines of the Zambian Copperbelt. He came to Australia in 1986 and since then has been
involved in the identification, assessment and acquisition of numerous projects and the formation, financing and management
of several ASX listed exploration companies. In addition to his work in Australia and Africa he has spent several years operating
in the People’s Republic of China.
Mr Stone is a Member of the Australasian Institute of Mining and Metallurgy and a Fellow of the Australian Institute of Company
Directors.
Mr Stone has not held any former public company directorships in the last three years.
Matthew Horgan, BSc (Hons), MBA, GAICD, MAusIMM, (Non-Executive Director)
Matt is a high-performing mining executive who has worked across a variety of functional areas including technical (chemical
engineering), marketing, commercial, investor relations, project development, and corporate development/M&A. In particular,
he has recent and direct experience in the technical and commercial project development of African domiciled mineral assets.
Prior to joining Bannerman Energy Limited (ASX: BMN) as Vice President of Corporate Development, Matt held the role of
Head of Corporate Development and Investor Relations at ASX-listed Tanzanian rare earths developer, Peak Rare Earths (ASX:
PEK). Prior to that, he was a Senior Associate at leading boutique investment bank, Azure Capital.
Matt’s early career spanned approximately 10 years with global aluminium major, Alcoa (NYSE: AA). There he held various roles
including Manager, Global Corporate Development and Business Development and Commercial and Marketing Specialist.
Matt holds a Bachelor of Chemical Engineering (First Class Honours) from Canterbury University and a Master of Business
Administration from the University of Western Australia. He is also a Graduate of the Australian Institute of Company Directors.
Mr Horgan has not held any former public company directorships in the last three years.
Brian Thomas, BSc, MBA, Grad Cert App Fin Inv, MAusIMM, MAICD, SAFin, (Non-Executive Director)- appointed on 8 April 2025.
Mr Thomas is an experienced Director and Corporate Executive with significant domestic and international resources
management experience. Mr Thomas spent 15 years in the financial services sector with executive roles in corporate advisory,
corporate stockbroking, investment banking and banking. He has more than 35 years of mining and exploration industry
experience covering a broad range of commodities from precious, base and battery metals, bulk and industrial minerals,
diamonds plus oil and gas.
Mr. Thomas holds a BSc in Geology and Mineral Economics from the University of Adelaide, an MBA from the University of
Western Australia, and a Graduate Certificate in Applied Finance & Investment from the Securities Institute of Australia. He is
also a Member of the Australasian Institute of Mining and Metallurgy, the Australian Institute of Company Directors and the
Financial Services Institute of Australasia.
Most recently Mr Thomas served as Chairman of Azure Minerals Ltd and is currently Non-Executive Chairman at Peregrine Gold
Limited (ASX: PGD) and Non-Executive Director at Fortuna Metals Limited (ASX: FUN).
James Guy, BAppSc, GradDipApplFin, (Non-Executive Director) – retired on 8 April 2025.
Mr Guy is a geologist who brings with him more than 30 years of technical experience in the mining industry, both locally and
internationally, with extensive experience in exploration, project feasibility and mining operations. Mr Guy has previously held
senior executive positions with several ASX listed junior resource companies and with banking group, NR Rothschild & Sons. He
is currently principal of James Guy & Associates Pty Ltd.
Mr Guy has not held any former public company directorships in the last three years.
5
Directors’ Report Continued
COMPANY SECRETARY
Jade Styants, BCom, CA, FCIA, FCIS.
Ms Styants is a Fellow Chartered Secretary, Chartered Accountant and corporate finance professional with over 25 years’
experience assisting a range of Australian and international listed and unlisted companies across a range of industry sectors.
Interests in the shares and options of the Company and related bodies corporate
As at the date of this report, the interests of the directors in the shares and options of Castle Minerals Limited were:
Director
Ordinary Shares
Stephen Stone
3,240,570
Brian Thomas
-
Matthew Horgan
557,777
Options over Ordinary
Shares
2,139,447
689,813
-
PRINCIPAL ACTIVITIES
During the year the Group carried out exploration on its mineral licences with the objective of identifying economic deposits
of gold, graphite and other minerals. There was no significant change in the nature of the Group’s activities during the year.
DIVIDENDS
No dividends were paid, declared or recommended during the financial year.
REVIEW OF OPERATIONS
GHANA, WEST AFRICA
Gold
Castle, through its 100%-owned Ghanaian subsidiary Carlie Mining Ltd, holds extensive tenure in Ghana’s Upper West
Region encompassing a wide expanse of highly prospective Birimian terrane which is host to many of Ghana’s and West
Africa’s largest gold mines.
Castle continues to advance the evaluation of its Kpali and Kandia Gold Projects, where it has continued to delineate
additional mineralisation and generate numerous new prospects.
Kpali Gold Project
The Kpali Gold Project lies at the convergence of two major greenstone belts and three key regional structures all of
which are associated with gold mineralisation. The geological setting at Kpali is consistent with major orogenic-style
deposits elsewhere in West Africa, highlighting its potential to evolve into a substantial mining camp. The project
comprises the Kandia and Bundi deposits and several prospects including Kpali East, Wa South and Wa East.
Several drilling campaigns during the year at the Kpali deposit confirmed the presence of, and extended, multiple
mineralised lodes. At the Bundi discovery, 4km north of the Kpali deposit, Castle completed the first drilling programme
in more than a decade, successfully demonstrating continuity of mineralisation along strike and to depth. These results
validated earlier reconnaissance work and confirmed Bundi as a high-priority target worthy of continuing evaluation.
Kandia Gold Project
Drilling campaigns at the Kandia Gold Project focused on testing several zones of gold anomalism along a 16km
structurally controlled corridor adjacent to a regional-scale granite intrusion. Drilling at the 4000 and 8000 zones
confirmed the presence of open-ended primary mineralisation below extensive anomalism and artisanal workings. Several
zones of geochemical anomalism along the prospective trend have yet to be tested.
Castle’s Kpali and Kandia Gold Projects represent two excellent discoveries by Castle from first principles in northern
Ghana, an emerging gold frontier in West Africa where numerous gold deposits have been discovered and mines
established in recent years. They present a tremendous opportunity and focus for the discovery of additional gold
mineralisation building on the extensive quality datasets that Castle has generated. This includes two extensive high6
Directors’ Report Continued
resolution aeromagnetic surveys which it has recently had reprocessed to enable existing discoveries to be placed in
better structural context and to highlight additional areas for evaluation.
Auger drilling programmes commenced in August 2025, initially at Kandia and will then move to Kpali, to test for
extensions of known mineralisation and to validate prioritised new targets. These programmes will lay the groundwork
for the next phase of systematic discovery in the Upper West region.
Graphite
Castle’s 100%-owned Kambale Graphite Project, held through its 100%-owned Ghanaian subsidiary Kambale Graphite
Limited, is located in Ghana’s Upper West Region. The project has considerable commercial merit as its fine flake graphite
is particularly suited for use in the production of Battery Anode Material (“BAM”) required in the manufacture of batteries
for EV vehicles and power storage.
Extensive drilling culminated in the definition of an open-ended 22.4Mt JORC (2012) resource grading 8.6% TGC. During
the year, Castle also completed bench-scale concentration test work, which successfully upgraded representative material
collected by diamond drilling to a 95% LOI saleable concentrate using conventional processing, This was followed by
micronisation and spheronisation test work and then, at a specialist facility in Germany, a purification process that
achieved an ultra-pure 99.97% LOI fine flake concentrate with no impurities of concern. Electrochemical tests that
followed confirmed the purified material is highly suitable for use in lithium-ion battery anodes and other battery
chemistries, reinforcing its ability to play an important role in the energy storage supply chain and to create a new industry
in Ghana.
In November 2024 Castle executed a landmark indicative non-binding term sheet (“Term Sheet”) with Ghana’s Mineral
Income Investment Fund (“MIIF”) for a combined investment of US$2.0M (~A$3.0M) to advance the Kambale Graphite
Project. Since it’s signing there has been minimal progress in formalising the investment due to a change of government
and key executives at MIIF which is now in the process of reconsidering its investment priorities.
No field work was undertaken at the project other than Castle, which directly and through specialist consultants,
continued to engage with local communities to ensure their support for its progress. Castle has also advised that, in
addition to the possible investment by MIIF, it is considering ways by which it can monetise its interest, most likely through
a partial or total sale or farm-out arrangement.
WESTERN AUSTRALIA
Wanganui & Polelle
An option to explore and acquire a 75% interest in the Meekatharra project was provided to ASX listed Great Boulder
Resources Limited (ASX: GBR) in November 2023. It is making good progress with its strategy to build a critical mass of
gold resources at its regional-scale Side Well Gold Project, near Meekatharra. It is negotiating to have in place an access
agreement with the relevant Native Title party to enable field work to commence at Wanganui and Pollele. Castle retains
a 1% gross revenue royalty over each of the Wanganui and Polelle projects.
Beasley Creek
Castle sold its 80% interest in the Beasley Creek Project in June 2025. The Company will retain a 1.6% NSR mineral royalty
over the project.
7
Directors’ Report Continued
FINANCIAL REVIEW
The Group began the financial year with a cash reserve of $1,023,219. During the year, the Group raised $4,500,000 (before
costs) from the issue of 69,668,520 fully paid ordinary shares (on a post consolidation basis). Funds were primarily used to
progress exploration at the Company’s gold projects in Ghana and to provide it with flexibility to respond to new
opportunities.
During the year total exploration expenditure incurred by the Group amounted to $2,569,405 (2024: $1,991,706). In line
with the Company’s accounting policies, all exploration expenditure is expensed as incurred. Net administration
expenditure incurred amounted to $1,088,354 (2024: $889,667).
The Group incurred an operating loss after income tax for the year ended 30 June 2025 of $3,670,604 (2024: $2,881,373).
The Group’s cash balance as at 30 June 2025 was $2,499,615 (2024: $1,023,219).
Operating Results for the Year
Summarised operating results are as follows:
30 June 2025
Other Income
30 June 2024
Results
Other Income
Results
Consolidated Group other
income and loss
21,352
(3,670,604)
88,095
(2,881,373)
Basic loss per share (cents)
-
(5.5)
-
(5.1)
Business Risk Management
The board is responsible for ensuring that risks, and opportunities, are identified on a timely basis and that activities are aligned
with the risks and opportunities identified by the board.
The Company believes that it is crucial for all board members to be a part of this process, and as such the board has not
established a separate risk management committee.
The board has several mechanisms in place to ensure that management's objectives and activities are aligned with the risks
identified by the board. These include the following:
•
•
board approval of a strategic plan, which encompasses strategy statements designed to meet stakeholders needs and
manage business risk; and
implementation of board approved operating plans and budgets and board monitoring of progress against these budgets.
The Company is committed to the effective management of risk to reduce uncertainty in the Company’s business outcomes
and to protect and enhance shareholder value. There are various risks that could have a material impact on the achievement
of the Company’s strategic objectives and future prospects. The key risks affecting the Company and its future performance
include but are not limited to:
Risk
Exploration risk
Details
The Company’s projects are at various stages of exploration, and potential investors should
understand that mineral exploration and evaluation is a high-risk undertaking. The Company’s
performance is dependent on the successful exploration and evaluation of resources or reserves.
There can be no assurance that exploration of the Company’s projects, or any other
tenements/licences that may be acquired in the future, will result in the discovery of a significant
economic mineral deposit. Even if a deposit is identified by the Company, there can be no guarantee
that it can be economically exploited. The future exploration activities of the Company may be
affected by a range of factors including geological conditions, limitations on activities due to
seasonal weather patterns, unanticipated operational and technical difficulties, industrial and
environmental accidents, local title processes, changing government regulations and many other
factors beyond the control of the Company.
In addition, the tenements/licences forming the projects of the Company may include various
restrictions excluding, limiting or imposing conditions upon the ability of the Company to conduct
exploration activities. While the Company will formulate its exploration plans to accommodate and
work within such access restrictions, there is no guarantee that the Company will be able to satisfy
8
Directors’ Report Continued
Risk
Details
such conditions on commercially viable terms, or at all.
The Company’s potential future earnings, profitability and commercialisation of its resources will be
dependent on the successful discovery and subsequent extraction of those resources to the extent
that may be required to fulfil commercial obligations. Successful commodity development and
production is dependent on obtaining all necessary consent and approvals and the successful
design, construction and operation of efficient gathering, processing and transportation facilities.
No assurance can be given that the Company will be able to obtain all necessary consents and
approvals in a timely manner, or at all.
Regulatory risk
The Company’s exploration activities are dependent upon the maintenance (including renewal) of
the tenements/licences in which the Company has or acquires an interest. Maintenance of the
Company’s tenements/licences is dependent on, among other things, the Company’s ability to meet
the licence conditions imposed by relevant authorities. Although the Company has no reason to
think that the tenements/licences in which it currently has an interest will not be renewed, there is
no assurance that such renewals will be given as a matter of course and there is no assurance that
new conditions will not be imposed by the relevant authority or whether the Company will be able
to meet the conditions of renewal on commercially reasonable terms, if at all.
Liquidity and
future funding risk
The Company has no operating revenue and is unlikely to generate any operating revenue in the
foreseeable future. Exploration and evaluation costs will continue to use funds from the Company's
current cash reserves.
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they
fall due. The Company has in place a planning and budgeting process to help determine the funds
required to meet its operating and growth objectives. The Company prepares cash forecasts and
maintains cash balances to meet short and long-term cash requirements. The Company’s objective
is to raise sufficient funds from equity and/or debt to finance its exploration and evaluation activities
until its operations become profitable.
The Company’s ability to continue its exploration and evaluation activities over time may depend in
part on its ability to raise additional funds. There can be no assurance that any such equity or debt
funding will be available to the Company on favourable terms, or at all. If adequate funds are not
available on acceptable terms, the Company may not be able to take advantage of opportunities,
respond to competitive pressures and could result in delay or reduction in further exploration and
evaluation activities which could have a material adverse effect on the Company’s ability to continue
as a going concern.
Sovereign risk
A number of the Company’s exploration activities are carried out in Ghana. As a result, the Company
will be subject to political, social, economic and other uncertainties including, but not limited to,
changes in policies or the personnel administering them, foreign exchange restrictions, changes of
law affecting foreign ownership, currency fluctuations, royalties and tax increases in that country.
Government policy
The availability and rights to explore and mine, as well as industry profitability generally, can be
affected by changes in government policy that are beyond the control of the Company. Changing
attitudes to environmental, land care, cultural heritage and indigenous land rights’ issues, together
with the nature of the political process, provide the possibility for future policy changes. There is a
risk that such changes may affect the Company’s exploration plans or, indeed, its rights and/or
obligations with respect to the tenements/licences (inclusive of applications).
Failure to satisfy
expenditure
commitments and
licence conditions
Each tenements/licence is granted for a specific term and carries with it annual expenditure and
reporting commitments, as well as other conditions requiring compliance. Consequently, the
Company could lose title to its interest in the tenements/licences if conditions are not met, if
insufficient funds are available to meet expenditure commitments or if exemptions are not granted.
Estimates of
Mineral Resources
The Company has estimated Inferred and Indicated Mineral Resources across its tenements/licences.
The Mineral Resources are estimates only and are based on interpretations, knowledge, experience
and industry practice which may change when new techniques or information becomes available.
Inclusion of material in a Mineral Resource estimate does not require a conclusion that material may
be economically extracted at the tonnages indicated, or at all. Estimates that are valid when made
9
Directors’ Report Continued
Risk
Details
may change significantly when new information becomes available. In addition, commodity price
fluctuations, as well as increased production costs or reduced throughput and/or recovery rates, may
render reserves and resources uneconomic and so may materially affect the estimates.
Reliance on key
personnel
The Company has just a few executives and senior personnel and so progress in pursuing its
exploration and evaluation programmes within the time frames and within the costs structure as
currently envisaged could be dramatically influenced by the loss of existing key personnel or a failure
to secure and retain additional key personnel as the Company’s exploration programme develops.
The resulting impact from such loss or failure to personnel would be dependent upon the quality
and timing of the employee’s replacement.
Changes in
commodity price
The Company’s prospects, perceived
Share your feedback
Discover