Next Phase of Drilling to Commence at Kpali Gold Project
Released
Released
Announcement PDF
Announcement
ASX: CDT
24 March 2025
Next Phase of Drilling to Commence at Kpali Gold Project
•
RC drill rig secured and will mobilise to site in the coming days.
•
2,500m programme has been designed to:
• test for extensions to high grade zones at the Kpali and nearby Bundi
prospects.
• investigate for possible new distal mineralisation associated with the main
host shear zone.
• evaluate artisanal miner workings that recently appeared 1.5km south of the
Kpali prospect on the same north-south structural trend.
•
Drilling at Kpali and Bundi is expected to be completed mid-April 2025 with
assay results reported in early-May 2025.
•
Second drilling programme scheduled to commence in April 2025 to follow-up
recent high grade intercepts obtained at the separate Kandia Gold Project.
Castle Executive Chairman, Stephen Stone, commented
“We are looking forward to the RC drill rig arriving shortly at the Kpali Gold Project to follow-up
the excellent intercepts we obtained in January at the namesake Kpali prospect which included
a very impressive 12m at 8.29g/t Au from 25m, including 6m at 11.60g/t Au from 31m and a
peak 1m intercept of 20.43g/t Au at 36m in a ‘hangingwall’ lode, and also 4m at 4.16g/t Au
from 95m in a lower ‘footwall’ lode.
We will also undertake follow-up drilling at the Bundi prospect, 4km north of Kpali, to test for
depth extensions to mineralisation delineated there over some 1.4km. Three other holes will
investigate artisanal miner workings on some rare outcropping quartz veins 1.5km south of
Kpali. These lie on the same structural trend as Kpali and Bundi so success here could have
positive implications for the broader prospectivity of the district.
As we increase our understanding of the Kpali Gold Project we can now see many similarities
in its geological and structural setting with that of several major deposits in Ghana and West
Africa.
This is also the case for the separate Kandia Gold Project which we aim to return to in April to
follow-up some very robust intercepts we recently obtained there.
West Africa is where big gold discoveries are still being made. Ghana’s relatively underexplored northern region is emerging as a new frontier as demonstrated by the recent
commissioning of the Cardinal Resources 5.1Moz gold Namdini deposit and the predevelopment 2.8Moz gold Black Volta Gold Project of Azumah Resource whose high-grade
Julie deposit lies immediately north of Kandia.”
_____________________________________________________________________________________________________________________________
Principal and Registered Office Suite 9 / 11 Ventnor Avenue West Perth, Western Australia 6005 | Postal PO Box 437 West Perth, Western Australia 6872
Contact admin@castleminerals.com | www.castleminerals.com | Telephone +61 8 93227018
Board: Executive Chairman, Stephen Stone | Non-Executive Directors, James Guy. Matthew Horgan | Company Secretary, Jade Styants
Capital Structure Ordinary Shares: 1,927.8M | Unlisted Options: 657.2M | ASX Code CDT | ACN 116 095 802
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
Artisanal workings
Fig 1: Kpali Gold Project showing key prospects, max down-hole gold values and
VTEM derived targets on reprocessed VTEM geophysics.
Castle Minerals Limited (“Castle” or the “Company”) advises that a 2,500m RC drill programme is
expected to commence in the coming days at its 100% owned Kpali Gold Project in Ghana’s Upper West
Region.
The Kpali Gold Project comprises a cluster of prospects including the namesake Kpali prospect and the
Bundi prospect 4km north.
The drilling will follow-up excellent intercepts recently obtained at the Kpali prospect which included (refer
ASX 13 February 2025):
•
•
12m at 8.29g/t Au from 25m (24KPRC010) incl.
• 6m at 11.60g/t Au from 31m and
• a peak 1m intercept value of 20.43g/t Au at 36m and
• 4m at 4.16g/t Au from 95m.
7m at 2.23g/t Au from 35m (24KPRC011) incl.
Page 2 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
•
•
•
•
•
• 4m at 3.23g/t Au from 35m and
• 11m at 2.24g/t Au from 50m incl.
• 1m at 8.29g/t Au from 57m.
5m at 3.66 g/t Au from 78m (24KPRC012) incl.
• 2m at 7.09g/t Au 79m.
13m at 1.58g/t Au from 73m (24KPRC014) incl.
• 1m at 5.62g/t Au from 79m.
1m at 8.35g/t Au from 5m (24KPRC015) and
• 9m at 4.81g/t Au from 107m incl.
• 2m at 8.75g/t Au from 109m.
1m at 6.64g/t Au from 70m (24KPRC016).
7m at 1.67g/t Au from 39m (24KPRC017) and
• 3m at 3.08g/t Au from 78m.
Fig 2: Kpali Gold Prospect: Plan showing latest drill results and projection to surface of interpreted
multiple mineralised sub-parallel lodes on simplified sub-surface geology.
Two prior drill programmes at Kpali returned intercepts that included 4m at 3.66g/t Au from 26m, 3m at
5.20g/t Au from 125m, 28m at 2.26g/t Au from 81m including 5m at 8.41g/t from 89m, 10m at 2.01g/t
Au from 22m, 5m at 4.53g/t Au from 99m and 11m at 1.86 g/t Au from 143m (refer ASX 17 September
2024 and 28 January 2014).
The programme will also look to extend mineralisation along strike and to depth at Bundi where
mineralisation has already been delineated over a north-south strike of 1.4km. Historical intercepts
included (refer ASX 17 June 2013):
•
•
•
•
3m at 3.19g/t Au from 25m (13SWRC026);
6m at 3.32g/t Au from 37m (13SWRC027);
2m at 7.87g/t Au from 40m (13SWRC028); and
2m at 9.10g/t Au from 68m (13SWRC032).
Page 3 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
New artisanal workings identified
Recent geological mapping in the broader Project area has identified 1.5km south of the Kpali prospect
artisanal miner workings centred on some rare outcropping quartz veins (the majority of the Kpali Gold
Project is covered by eluvial and alluvial soils which mask the solid geology below). The working are not
extensive as yet but do lie on the same structural trend as the Kpali and Bundi prospects. This has very
positive implications for the district’s broader prospectivity.
Geological background
The Kpali Gold Prospect lies within a mineralised corridor associated with a 30m to 50m wide zone of
structural deformation immediately west of a granite intrusion. Four RC drilling programmes have
confirmed near-surface, shallow plunging high-grade lode-style mineralisation to a depth of at least
100m. Multiple, closely-spaced mineralised lodes have been identified over a 650m north-south strike.
Overall, the geological setting at the broader Kpali Gold Project is of a typically structurally-controlled,
orogenic style mineralisation within Birimian terrane. This is a similar setting to that hosting several worldclass gold mining operations in Ghana and West Africa generally.
The discovery of mineralisation at the Kpali Gold Project’s Kpali, Bundi, Kpali East, Wa South East and
Wa South West prospects are essentially “blind” discoveries in that the bedrock hosting mineralisation is
largely obscured by surficial cover. This explains the lack of artisanal mining activity which often entices
explorers into a new area. Castle’s structured and systematic approach to exploration in this environment
is proving highly effective across its extensive tenure.
Fig 3: Ghana’s northern region showing 1. the convergence on Castle’s Kpali Gold Project of the WaLawra and Bole-Bolgatanga Birimian greenstone belts and three major structures associated with
Birimian hosted gold deposits and 2. Castle’s other projects in the region including Kandia.
Page 4 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
A compelling driver for exploring Northern Ghana’s Kpali Gold Project is its advantageous location at the
convergence of two major greenstone belts (Bole-Bolgatanga and Wa-Lawra/Boromo) and three
regional-scale structures. These are all associated with gold deposits. This supports the thesis that the
region provides a large and prospective “search base” for the discovery of a major new West African
mining camp hosting a considerable gold endowment.
Northern Ghana has more recently seen two of West Africa’s major discoveries and success stories.
•
The 5.1Moz Namdini Gold Deposit, discovered by Cardinal Resources Limited prior to its takeover by
Shandong Gold Limited in 2020, has just been commissioned and lies on the same Bole-Bolgatanga
Birimian greenstone belt as Castle’s Kandia discovery; and
•
The Azumah Resources Limited owned 2.8Moz Black Volta Gold Project (“BVGP”) which is
earmarked for development in 2025. A majority of this gold was discovered by Castle’s Executive
Chairman, Stephen Stone, under his former stewardship of Azumah. Castle’s Kandia mineralised
trend is immediately along strike and south of the BVGP’s high-grade Julie deposit.
Follow-up drilling at Kandia Gold Project
Upon completion of drilling at the Kpali Gold Project attention will then turn to the Kandia Gold Project,
150km to the east. Drilling is expected to commence in April 2025 subject to rig availability.
The opportunity at Kandia is to delineate a large tonnage of shallow mineralisation across multiple, nearsurface open-pitable deposits along the 16km prospective north-east trending Kandia contact corridor.
Fig 4: Kandia Prospect: December 2024 and historical RC drilling over a 6km portion
of the total 16km prospective Birimian – granodiorite contact.
Page 5 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
The most recent drill programme at Kandia confirmed the continuity and depth extension of previously
defined shallow mineralisation at the “4000-zone” with grade, mineralised width and dip appearing to
increase with depth.
Drill hole intercepts included 7m at 3.36g/t Au from 149m within 24m at 1.78g/t Au from 139m and
5m at 3.49g/t Au from 82m within 11m at 2.26g/t Au from 79m (refer ASX 28 Jan 2025).
Authorised for release to ASX by the Board of Castle Minerals Limited:
Stephen Stone
Executive Chairman
stone@castleminerals.com
+61 (0)418 804 564
COMPETENT PERSON COMPLIANCE STATEMENT
The Company is not aware of any new information or data that materially affects the information included
in the relevant historical market announcements referenced herein.
ABOUT CASTLE MINERALS
Castle Minerals Limited is an Australian Securities Exchange (ASX: CDT)
listed and Perth, Western Australia headquartered company with interests in
several projects in Ghana and Western Australia that are prospective for gold,
graphite and base metals.
In Ghana, West Africa, Castle’s 100% owned Ghanaian subsidiary, Carlie
Mining Ltd, owns the Kpali Gold Project in the Upper West Region which
comprises the Kpali, Kpali East and Bundi gold prospects. The Kandia Gold
Project, is a separately located standalone discovery. All occur in highly
prospective Birimian geological terrane, the host to many of West Africa’s and
Ghana’s multi-million-ounce gold mines.
The 100% owned Kambale Graphite Project is also located in Ghana’s Upper
West Region. It is being progressed through technical and commercial
evaluation for the production of battery grade material to be used in lithium-ion
battery manufacture.
Farm-outs or sales have been or are being sought for the Company’s
West Australian projects. The Polelle Project, 7km southeast of the
operating Bluebird gold mine near Meekatharra, hosts a mainly
obscured and minimally explored greenstone belt prospective for gold
and possibly base metals. The Wanganui Project is prospective for
down-plunge high-grade gold shoots. Both have been optioned for
purchase to Great Boulder Resources Limited (ASX: GBR) for possible
incorporation into its emerging Side Well project.
The Terra Rossa copper-zinc project is located on the western edge of
the Earaheedy Basin. It is adjacent to the evolving World-Class
Chinook-Magazine zinc-lead project of Rumble Resources Ltd (ASX:
RTR).
The Beasley Creek Project is prospective for gold and lithium and lies on the northern flanks of the
Rocklea Dome in the southern Pilbara.
Page 6 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
PREVIOUSLY REPORTED INFORMATION RELATING TO THIS RELEASE
Additional details, where applicable, can be found in the releases referenced in this Report and/or in
releases lodged by the Company with the ASX, including the following:
Headline
Date
High Grade Gold intercepts Confirm Kpali Discovery
13 February 2025
Excellent Gold Intercepts From Drilling at Kandia Prospect
28 January 2015
Drilling Completed at Kpali and Kandia Gold Prospects
15 January 2025
Drilling Commences at Kpali and Kandia Gold Prospects
19 December 2024
Kpali Drilling Programme Completed and Drill-for-Equity Agreement
22 August 2024
Castle Commences Drilling at Kpali Gold Project
7 August 2024
Reprocessed Geophysics and Historical Intercepts to Drive Ghana Gold Expansion
11 June 2024
US$11.7 Million Farm-Out Agreement, Degbiwu and Gbiniyiri Licences, Ghana
14 August 2019
New Graphite Discovery in Ghana
30 July 2014
Maiden Resource Estimate for the Kpali Gold Prospect
2 July 2014
New Gold Zone Intersected at Kpali
20 March 2014
High Grade Gold Intersected at Bundi Prospect
31 January 2014
Kpali Gold Discovery
28 January 2014
Kpali Drill Results
18 January 2014
Multiple EM targets identified at Bundi Prospect
28 October 2013
Geophysical Survey Commences at Bundi and Kpali
13 August 2013
Drilling Extends Kpali Gold Discovery
4 July 2013
High Grade Gold Horizon Defined at Bundi Prospect
17 June 2013
New Gold Discovery at Kpali Prospect in Ghana
24 May 2013
RC Drilling Confirms Gold and Zinc Discovery at Bundi Prospect
23 May 2013
New 600m Long Gold Zone Defined – Kpali Prospect
20 May 2013
New Gold Hits South of Bundi Prospect RC drilling Commences
6 May 2013
Bundi Gold Target Increases to 1,400m
22 April 2013
Drilling Confirms Gold Mineralisation at Wa South and New Prospect Identified
Auger Drilling Defines Large Gold Anomaly at Wa South
26 September 2012
19 May 2011
OTHER COMPLIANCE STATEMENTS
Competent Persons Statement – Kpali Gold Project Exploration Results
The scientific and technical information in this announcement that relates to the geology of the deposits
and exploration results is based on information compiled by Mr Stephen Stone, who is Executive
Chairman of Castle Minerals Limited. Mr Stone is a Member of the Australian Institute of Mining and
Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Stone is the Qualified Person overseeing Castle’s exploration projects
and has reviewed and consented to the disclosure of all scientific or technical information contained in
this announcement that relates to the geology of the deposits and exploration.
Cautionary Statement – Australian Projects
All of Castle’s projects in Australia are considered to be of grass roots or of relatively early-stage
exploration status. There has been insufficient exploration to define a Mineral Resource. No Competent
Person has done sufficient work in accordance with JORC Code 2012 to conclusively determine or to
Page 7 of 8
Castle Minerals Limited (ASX: CDT): RC Drilling to Commence at Kpali Gold Project - 24 March 2025
estimate in what quantities gold or other minerals are present. It is possible that following further
evaluation and/or exploration work that the confidence in the information used to identify areas of interest
may be reduced when reported under JORC Code (2012).
Forward Looking Statement
Statements regarding Castle’s plans, forecasts and projections with respect to its mineral properties and
programmes are forward-looking statements. There can be no assurance that Castle’s plans for
development of its mineral properties will proceed. There can be no assurance that Castle will be able to
confirm the presence of Mineral Resources or Ore Reserves, that any mineralisation will prove to be
economic or that a mine will be successfully developed on any of Castle’s mineral properties. The
performance of Castle may be influenced by a number of factors which are outside the control of the
Company, its Directors, staff or contractors.
Page 8 of 8
Share your feedback
Discover