Drilling Completed at Kpali and Kandia Gold Prospects
Released
Released
Announcement PDF
Announcement
ASX: CDT
15 January 2025
Drilling Completed at Kpali and Kandia Gold Prospects
Results expected early February 2025
Castle Minerals Limited (“Castle” or the “Company”) advises that it has completed a 12-hole, 1,505m RC
drilling campaign at its Kpali and Kandia gold prospects within its broader 2,686km2 Wa Gold Project in
Ghana’s emerging Upper West Region.
Results from eight holes totalling 923m at Kpali and four holes totalling 582m at Kandia are expected to
be reported in early February 2025.
All holes have been designed to extend high-grade mineralised zones at both prospects as part of
Castle’s aspiration to delineate an initial combined 1.0Moz of gold resources across a cluster of
prospects.
West Africa is one of the world’s premier regions to be exploring for gold, delivering an enviable fifteen
discoveries of over two million ounces each since 2012 and Ghana’s northern region is now considered
one of the best areas to find more of these.
Notable projects include the newly commissioned 5.1Moz Namdini gold deposit discovered by Cardinal
Resources Limited prior to its takeover in 2020 and the Azumah Resources Limited owned 2.8Moz Black
Volta Gold Project (“BVGP”) which is earmarked for development in 2025. Namdini lies on the same
Bole-Bolgatanga Birimian greenstone belt as Kandia and the BVGP’s Julie deposit is immediately along
strike of the Kandia mineralised trend.
Fig 1: Ghana’s Upper West Region showing convergence on Castle’s Degbiwu and Gbiniyiri
licences of the Wa-Lawra and Bole-Bolgatanga Birimian greenstone belts and three major
structures associated with several major Birimian hosted gold deposits in the same region.
_____________________________________________________________________________________________________________________________
Principal and Registered Office Suite 9 / 11 Ventnor Avenue West Perth, Western Australia 6005 | Postal PO Box 437 West Perth, Western Australia 6872
Contact admin@castleminerals.com | www.castleminerals.com | Telephone +61 8 93227018
Board: Executive Chairman, Stephen Stone | Non-Executive Directors, James Guy. Matthew Horgan | Company Secretary, Jade Styants
Capital Structure Ordinary Shares: 1,896.8M | Unlisted Options: 587.9M | ASX Code CDT | ACN 116 095 802
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
Kpali Gold Project and Prospects
A compelling driver for exploring the Kpali Gold Project is its location at the convergence of two major
greenstone belts (Bole-Bolgatanga and Wa-Lawra/Boromo) and three regional-scale structures that are
all associated with major gold deposits.
The subsequent confirmation by Castle of gold mineralisation at the Kpali Gold Project (which comprises
the Kpali, Kpali East, Bundi and Wa South prospects) confirms its high-level prospectivity.
Wide-spaced reconnaissance geochemical sampling followed by a series of RAB, aircore and RC drilling
programmes confirmed primary mineralisation associated with several robust gold anomalies at the Kpali
prospect and at the Bundi prospect, 5km to the north
At the Kpali prospect, a ~30m to 50m wide zone of structural deformation hosts hydrothermal lode-style
mineralisation over a combined strike of at least 850m and to a confirmed depth of at least 100m where
it remains open.
Mineralisation is hosted in Birimian metasediments adjacent to a local granodiorite intrusion. This is a
similar geological setting to that hosting several world-class gold mining operations in the immediate
region and across Ghana and West Africa generally.
An RC drilling programme completed in September 2024 focused on the Kpali and Kpali East prospects
and was designed to better understand the controls on and distribution of mineralisation, especially
higher grade material (refer ASX release 17 September 2024).
A summary of intercepts from historical and recent drill intercepts at Kpali appears in Figure 2 (also refer
to relevant ASX releases in Table: Previously Reported Information Relating to this Release).
Fig 1: North-south long-section through main mineralised lodes at Kpali highlighting zones of
plunging higher grade gold mineralisation.
Fig 2: Historical (white flags) and 2024 (red flags) RC drilling results at Kpali and Kpali East.
prospects.
Zones of plunging higher grade gold mineralisation are highlighted in the north-south long-section
through the main mineralised lodes at the Kpali Prospect – Figure 3.
Page 2 of 7
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
Fig 3: North-south long-section through main mineralised lodes at Kpali highlighting zones of
plunging higher grade gold mineralisation.
Kandia Prospect
The opportunity at the Kandia prospect is to delineate in Birimian sediments a large, shallow depth, bulk
tonnage of gold mineralisation associated with a 25km southwest-trending prospective sheared contact
with an adjacent regional-scale granodiorite intrusion.
Following extensive wide-spaced reconnaissance geochemical sampling, subsequent drilling of
anomalies has delineated mineralisation over two particular zones, the “4000” and “8000” for which a
combined maiden 2012 JORC Mineral Resource of 92,659oz grading 1.1g/t Au was estimated (refer ASX
release 2 July 2014).
Historical drilling intercepts are summarised in Figure 4.
Sporadic artisanal mining occurs in areas of gold anomalism but recently workings have also appeared
outside of where Castle has been exploring.
Holes just completed at Kandia are designed to confirm continuity and controls of mineralisation in the
“4000” zone and to identify any zones of higher-grade material.
Page 3 of 7
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
Fig 4: Kandia Prospect: Historical RC drilling within a 6km portion of the prospective
25km strike Birimian – granodiorite contact.
Page 4 of 7
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
The Company is not aware of any material changes in the status of the historical information reported in
this release.
Authorised for release to ASX by the Board of Castle Minerals Limited:
Stephen Stone
Executive Chairman
stone@castleminerals.com
+61 (0)418 804 564
ABOUT CASTLE MINERALS
Castle Minerals Limited is an Australian Securities Exchange
(ASX: CDT) listed and Perth, Western Australia headquartered
company with interests in several projects in Ghana and
Western Australia that are prospective for gold, graphite and
base metals.
In Ghana, West Africa, Castle’s 100% owned Ghanaian
subsidiary, Carlie Mining Ltd, holds the Wa Gold Project in the
Upper West Region. The Kpali sub-project comprises the
Kpali, Kpali East and Bundi prospects. The Kandia
prospect is a separate standalone discovery. All occur in
highly prospective Birimian geological terrane, the host to
many of West Africa’s and Ghana’s multi-million-ounce gold
mines.
The 100% owned Kambale Graphite Project is also located
in Ghana’s Upper West Region. It is being progressed through
technical and commercial evaluation for the production of
battery grade material to be used in lithium-ion battery
manufacture.
Farm-outs or sales have been or are being sought for the
Company’s West Australian projects:
The Polelle Project, 7km southeast of the operating
Bluebird gold mine near Meekatharra, hosts a mainly
obscured and minimally explored greenstone belt
prospective for gold and possibly base metals. The
Wanganui Project is prospective for down-plunge
high-grade gold shoots. Both have been optioned for
purchase to Great Boulder Resources Limited (ASX:
GBR) for possible incorporation into its emerging
Side Well project.
The Terra Rossa copper-zinc project is located on
the western edge of the Earaheedy Basin. It is
adjacent to the evolving World-Class ChinookMagazine zinc-lead project of Rumble Resources Ltd
(ASX: RTR).
The Beasley Creek Project is prospective for gold
and lithium and lies on the northern flanks of the
Rocklea Dome in the southern Pilbara.
Page 5 of 7
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
PREVIOUSLY REPORTED INFORMATION RELATING TO THIS RELEASE
Additional details, where applicable, can be found in the releases referenced in this Report and/or in
releases lodged by the Company with the ASX, including the following:
Headline
Date
Drilling Commences at Kpali and Kandia Gold Prospects
19 December 2024
Kpali Drilling Increases Expectations for New West African Gold camp
17 September 2024
Kpali Drilling Programme Completed and Drill-for-Equity Agreement
22 August 2024
Castle Commences Drilling at Kpali Gold Project
7 August 2024
Reprocessed Geophysics and Historical Intercepts to Drive Ghana Gold Expansion
11 June 2024
US$11.7 Million Farm-Out Agreement, Degbiwu and Gbiniyiri Licences, Ghana
14 August 2019
Maiden Resource Estimate for the Kpali Gold Prospect
New Gold Zone Intersected at Kpali
2 July 2014
20 March 2014
High Grade Gold Intersected at Bundi Prospect
31 January 2014
Kpali Gold Discovery
28 January 2014
Kpali Drill Results
18 January 2014
Multiple EM targets identified at Bundi Prospect
28 October 2013
Geophysical Survey Commences at Bundi and Kpali
13 August 2013
Drilling Extends Kpali Gold Discovery
4 July 2013
High Grade Gold Horizon Defined at Bundi Prospect
17 June 2013
New Gold Discovery at Kpali Prospect in Ghana
24 May 2013
RC Drilling Confirms Gold and Zinc Discovery at Bundi Prospect
23 May 2013
New 600m Long Gold Zone Defined – Kpali Prospect
20 May 2013
New Gold Hits South of Bundi Prospect RC drilling Commences
6 May 2013
Bundi Gold Target Increases to 1,400m
22 April 2013
New Gold Target Identified at Kandia West Project
Drilling Confirms Gold Mineralisation at Wa South and New Prospect Identified
Maiden Kandia Resource of 107,500oz
2 October 2012
26 September 2012
5 December 2011
Drilling Confirms Gold Discovery Along Kandia Trend
26 May 2011
Auger Drilling Defines Large Gold Anomaly at Wa South
19 May 2011
Significant New Gold Discovery Along Kandia Trend
9 March 2011
New gold Zone Discovered Along Kandia Trend
21 February 2011
Drilling Confirms Widespread Mineralisation At Kandia Prospect
15 June 2010
+15km Long Soil Anomaly Along Kandia Trend
3 June 2010
Drilling Commences At Kandia Gold Prospect
Visible Gold and Rock Chip Assays Confirm Kandia Drill Target – Drilling to
Commence
18 May 2010
6 May 2010
STATEMENTS
Cautionary Statement
All of Castle’s projects in Australia are considered to be of grass roots or of relatively early-stage
exploration status. There has been insufficient exploration to define a Mineral Resource. No Competent
Person has done sufficient work in accordance with JORC Code 2012 to conclusively determine or to
estimate in what quantities gold or other minerals are present. It is possible that following further
evaluation and/or exploration work that the confidence in the information used to identify areas of interest
may be reduced when reported under JORC Code (2012).
Page 6 of 7
Castle Minerals Limited: Drilling Completed at Kpali and Kandia Gold Prospects.
Forward Looking Statement
Statements regarding Castle’s plans, forecasts and projections with respect to its mineral properties and
programmes are forward-looking statements. There can be no assurance that Castle’s plans for
development of its mineral properties will proceed. There can be no assurance that Castle will be able to
confirm the presence of Mineral Resources or Ore Reserves, that any mineralisation will prove to be
economic or that a mine will be successfully developed on any of Castle’s mineral properties. The
performance of Castle may be influenced by a number of factors which are outside the control of the
Company, its Directors, staff or contractors.
Page 7 of 7
Share your feedback
Discover