Drilling Completed Ahead of Schedule at Kpali Gold Project
Released
Released
Announcement PDF
Castle Minerals Limited
ASX Announcement
20 May 2025
Drilling Completed Ahead of Schedule at Kpali Gold Project
• Combined 20-hole, 2,500m RC drilling programme at the Kpali Gold Project
completed ahead of schedule.
• Drill hole assay samples are being progressively transported to the assay
laboratory in Ghana with reporting of results likely to be as follows:
• Kpali prospect: 12 holes completed. Reporting early-June 2025.
• Artisanal prospect: 3 holes completed. Reporting mid-June 2025.
• Bundi prospect: 5 holes completed. Reporting mid / late-June2025.
• Bundi was last drilled in 2014 and returned highly encouraging results including
intercepts of 1.0m at 51.03g/t Au and 6.0m at 3.32g/t Au.
• Castle will retain and move the drill rig 110km north east to drill the Kandia Gold
Project’s 4000 and 8000 discovery zones.
• Kandia Gold Project: 12 holes planned. Reporting early-July 2025.
• The emerging Kpali and Kandia gold camps provide a solid platform to support
Castle’s strategy to progressively define multiple prospects and its aspiration to
define in excess of one million ounces gold.
Castle Executive Chairman, Stephen Stone, commented:
“With a strengthened balance sheet following the $3 million placement completed in midApril this year, Castle has been able to seamlessly continue to aggressively explore its
highly prospective tenure in Ghana’s emerging under-explored northern region.
The team at Castle is highly enthused with progress in Ghana and there will be a steady
flow of results from early-June 2025 through late June 2025 from the three prospects
drilled at the Kpali Project. These will include the first ever results from the newly
identified Artisanal prospect, as well as the first drilling in more than 10 years at the Bundi
prospect.
The rig will now be moved to the Kandia Gold Project, 110km to the north east and along
strike from the 1.2 million ounce Julie deposit owned by Azumah Resources Limited.
Subject to the impact of seasonal rains, results from Kandia are scheduled to be available
around early-July 2025.
On a recent visit to the Kandia Gold Project I was really impressed to see the extent of
shallow artisanal workings, which is a very encouraging confirmation of the gold
endowment there and the broader opportunity for Castle to delineate more mineralisation
across our multi-prospect Ghanaian portfolio.”
Principal and Registered Office Suite 9 / 11 Ventnor Ave, West Perth, WA 6005 | Postal PO Box 437 West Perth, WA 6872
Contact admin@castleminerals.com | www.castleminerals.com | Telephone +61 8 93227018
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Fig 1: Ghana’s Upper West Region. Note convergence of fertile Wa-Lawra and Bole-Bolgatanga
Birimian greenstone belts and three major structures at the Kpali Gold Project plus the close
proximity of the Kandia Gold Project to the Azumah Resources’ Julie and Julie West deposits.
Castle Minerals Limited (“Castle”, “the Company”)(ASX:CDT) is pleased to provide an update on the
progress of RC drilling at its flagship Kpali and Kandia Gold Projects in the emerging Upper West Region
of Ghana where the Company is aspiring to delineate in excess of one million ounces across multiple
prospects.
Drilling at both projects was primarily designed to test for depth and along strike extensions to high grade,
lode-style mineralisation as a prelude to further rounds of drilling aimed at defining mineral resources.
Kpali Gold Project
Following some initial minor drill rig operational issues and intermittent rains (the wet season is approaching)
the Company is pleased to report that drilling at the Kpali Gold Project (“Kpali”) has just been completed
ahead of schedule. The programme, which comprised 20 holes for a total of 2,500m, drilled three separate
prospect areas; the namesake Kpali prospect and the Bundi and Artisanal prospects.
Drill hole samples have been progressively transported to the Intertek (Ghana) Limited assay laboratory in
Tarkwa, Ghana, 300km to the south.
The drilling status and expected reporting schedule for assay results is as follows:
• Kpali prospect: 12 holes completed - assays awaited. Reporting early-June 2025.
• Artisanal prospect: 3 holes completed - assays awaited. Reporting mid-June 2025.
• Bundi prospect: 5 holes completed – assays awaited. Reporting mid / late-June2025.
Page 2 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Fig 2: Kpali Gold Project: Key prospects on VTEM (electromagnetics) with Castle’s structural
interpretation
Whilst the drilling initially contemplated focusing only on the Kpali and Bundi prospect areas, Castle is
excited to have recently identified an area of artisanal miner workings that have appeared 1.5km south of
the Kpali prospect. These artisanal workings are associated with the same interpreted structural zone
controlling mineralisation at the Kpali and Bundi prospects. Three holes were drilled into these workings as
part of the current programme.
The drilling just completed at Bundi represents the first drilling undertaken at this prospect Bundi in more
than 10 years.
Page 3 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Better gold intercepts from prior RC drilling at Bundi included up to 1m at 51.03g/t Au from 168m and 6m at
3.32g/t Au from 37m (refer ASX releases 17 June 2013 and 29 April 2014):
•
•
•
•
•
•
•
•
3m at 3.19 g/t Au from 25m (13SWRC026);
6m at 3.32g/t Au from 37m (13SWRC027);
2m at 2.88g/t Au from 40m (13SWRC028);
2m at 9.09g/t Au from 68m (13SWRC032);
1m at 51.03g/t Au from 168m (13SWRC040):
2m at 3.02g/t Au from 144m (13SWRC044):
4m at 2.38g/t Au from 30m (13SWRC045): and
5m at 1.40g/t Au from 209m (14SWRC066)
Fig 3: Bundi prospect historical drilling results.
Page 4 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
A compelling driver for exploring Kpali is its advantageous location at the convergence of two major
greenstone belts (Bole-Bolgatanga and Wa-Lawra/Boromo) and three regional-scale structures. These are
all associated with gold mineralisation and support the thesis that Kpali provides a large and prospective
“search base” for the discovery of a major new West African mining camp.
Overall, the geological setting at Kpali is of typically structurally-controlled, orogenic style mineralisation
within Birimian terrane, the same setting as that hosting several world-class gold mining operations in Ghana
and West Africa generally.
The Kpali prospect lies within a mineralised corridor associated with a 30m to 50m wide zone of structural
deformation immediately west of a granite intrusion. This appears to be within a more extensive interpreted
north-south trending corridor linking the Bundi prospect to the north, the Kpali prospect itself and
interestingly, the recently appeared artisanal workings to the south.
Four drilling programmes of relatively wide-spaced holes at the Kpali prospect have confirmed and
delineated near-surface, shallow plunging, high-grade lode-style mineralisation to a depth of up 100m.
Multiple, closely-spaced, sub-parallel mineralised lodes have been identified over at least 650m strike.
Fig 4: Kpali Gold Prospect: Results of last drill programme (in red) and historical drilling with
outline of interpreted multiple mineralised sub-parallel lodes on simplified sub-surface geology.
Most recently Castle reported in February 2025 assay results from a fifth drilling programme at the Kpali
prospect. This comprised an eight-hole, 1,106m RC campaign. Intercepts included 12m at 8.29g/t Au from
25m including 6m at 11.60g/t Au from 31m and a peak 1m intercept of 20.43g/t Au at 36m in an
interpreted ‘hangingwall’ lode and then 4m at 4.16g/t Au from 95m in a lower “footwall” lode
(24KPRC010)(refer ASX 13 February 2025).
Additional intercepts included 7m at 2.23g/t Au from 35m (24KPRC011) including 11m at 2.24g/t Au from
50m, 5m at 3.6g/t Au from 78m (24KPRC012), 9m at 4.81g/t Au from 107m (24KPRC015) and 3m at
3.08g/t Au from 78m (KPRC017)(refer ASX 13 February 2025).
This last drilling programme focused specifically on extending at the Kpali prospect zones of high-grade,
lode-based mineralisation that appear to plunge to the north.
Page 5 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
These results enhance the confidence obtained from two prior programmes which included 4m at 3.66g/t
Au from 26m, 3m at 5.20g/t Au from 125m, 28m at 2.26g/t Au from 81m including 5m at 8.41g/t, 10m
at 2.01g/t Au, 5m at 4.53g/t Au, 11m at 1.86 g/t Au from 143m and 3m at 5.20g/t Au from 125m (refer
ASX 17 September 2024 and 28 January 2014).
All prospects comprising the Kpali Gold Project, including additionally the Kpali East, Wa South East and
Wa South West prospects, should be considered to be at an early stage of evaluation. However, given the
work completed to date they collectively bear all the hallmarks of a new West African mining camp and the
possibility of a considerable gold endowment in what should be remembered is a completely new area with
no prior gold indications.
Kandia Gold Project
With drilling completed at the Kpali Gold
Project, the same rig has been secured to
drill a 12-hole, 1,590m programme designed
to investigate mineralisation at the equally
compelling Kandia Gold Project (“Kandia”),
110km to the north east.
Whilst the wet season is approaching, the
intention is to continue drilling for as long as
feasible to execute the proposed programme
at Kandia.
The opportunity at Kandia is to delineate in
Birimian sediments a substantial, shallow
depth, bulk tonnage of gold mineralisation
associated with a 16km southwest-trending
prospective sheared contact with an adjacent
regional-scale granodiorite intrusion.
Following
extensive
wide-spaced
reconnaissance geochemical sampling,
subsequent drilling of anomalies delineated
mineralisation over two particular zones, the
“4000” and “8000” (refer ASX release 2 July
2014). These zones are providing the
present focus at Kandia.
Castle Executive Chairman, Stephen Stone, discussing
gold distribution with artisanals at the Kandia 4000-zone.
Results reported from the most recent fourhole, 582m RC drilling campaign at the 4000zone successfully confirmed continuity of
mineralisation and extended this to greater
depth.
All four holes intersected mineralisation with
two returning some of the best intercepts in
the Kandia area to date including 7m at
3.36g/t Au from 149m within 24m at 1.78g/t
Au from 139m (24KARC002) and 5m at
3.49g/t Au from 82m within 11m at 2.36g/t
Au from 79m (24KARC004) (refer ASX 28
Jan 2025).
Castle senior geologist, George Asamoah, inspecting
artisanal workings at Kandia 4000-zone.
Page 6 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Fig 5: Wa East regional map showing Castle licences and key prospects, including Kandia, on
structural interpretation of high-resolution magnetics.
Grade and width of mineralisation appear to be increasing with depth (i.e. 24KARC002) along with an
increase in dip and the likelihood of a north-trending plunge. There does appear to be a degree of surface
depletion of gold which may explain this.
Drilling was confined to the “4000-Zone” where mineralisation has previously been confirmed over a strike
of ~850m.
Extensive artisanal mining occurs within and around the 4000-Zone as it does also at the 8,000-Zone.
An April 2025 site visit by Executive Chairman, Stephen Stone, revealed that the artisanal workings are now
quite extensive and encouragingly occur over a considerable width along the northeast trend of the
mineralisation.
Page 7 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Fig 6: Kandia Project: December 2024 and historical RC drilling over a 6km portion of the total
16km prospective Birimian – granodiorite contact.
Page 8 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Gold in Northern Ghana
West Africa is regarded as one of the world’s premier regions to be exploring for gold, delivering an enviable
fifteen discoveries of over two million ounces each since 2012. Much of this new gold is found in Birimian
age ‘greenstone’ rocks, the host to many of West Africa’s and Ghana’s existing multi-million-ounce gold
mines. Birimian rocks are also the host to mineralisation at Kpali and Kandia.
Ghana’s “new frontier” northern region is now considered one of the most prospective areas to make such
discoveries in West Africa. Exploration in the region is relatively immature compared to Ghana’s south where
several world-class mines have been operating for decades. This immaturity along with its Birimian geology
and structural setting, is directly analogous to the prospective geology of Cote d’Ivoire which is receiving
considerable interest from a raft of junior to major explorers.
Perceptions of Northern Ghana’s prospectivity, are rapidly changing given the recent development of the
5.1Moz Namdini gold deposit, discovered by Cardinal Resources Limited prior to its takeover by Shandong
Gold Limited in 2020. Namdini lies on the same Bole-Bolgatanga Birimian greenstone belt as Castle’s
Kandia discovery.
The Azumah Resources Limited owned 2.8Moz Black Volta Gold Project (“BVGP”), earmarked for
development in 2025, is another recent discovery. A majority of this gold was delineated by Castle’s
Executive Chairman, Stephen Stone, under his former stewardship of Azumah. Castle’s Kandia mineralised
trend is immediately to the south of the BVGP’s high-grade Julie deposit.
Authorised for release to ASX by the Board of Castle Minerals Limited:
Stephen Stone
Executive Chairman
stone@castleminerals.com
+61 (0)418 804 564
ABOUT CASTLE MINERALS
Castle Minerals Limited is an Australian Securities Exchange (ASX: CDT) listed
and Perth, Western Australia headquartered company with interests in several
projects in Ghana and Western Australia that are prospective for gold, graphite
and base metals.
In Ghana, West Africa, Castle’s 100% owned Ghanaian subsidiary, Carlie
Mining Ltd, owns the Kpali Gold Project in the Upper West Region which
comprises the Kpali, Kpali East and Bundi gold prospects. The Kandia Gold
Project, is a separately located standalone discovery. All occur in highly
prospective Birimian geological terrane, the host to many of West Africa’s and
Ghana’s multi-million-ounce gold mines.
The 100% owned Kambale Graphite Project is also located in Ghana’s Upper
West Region. It is being progressed through technical and commercial
evaluation for the production of battery grade material to be used in lithium-ion
battery manufacture.
Page 9 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
Farm-outs or sales have been or are being sought for the Company’s
West Australian projects: The Polelle Project, 7km southeast of the
operating Bluebird gold mine near Meekatharra, hosts a mainly
obscured and minimally explored greenstone belt prospective for gold
and possibly base metals. The Wanganui Project is prospective for
down-plunge high-grade gold shoots. Both have been optioned for
purchase to Great Boulder Resources Limited (ASX: GBR) for
possible incorporation into its emerging Side Well project.
The Terra Rossa copper-zinc project is located on the western edge
of the Earaheedy Basin. It is adjacent to the evolving World-Class
Chinook-Magazine zinc-lead project of Rumble Resources Ltd (ASX:
RTR).
The Beasley Creek Project is prospective for gold and lithium and
lies on the northern flanks of the Rocklea Dome in the southern
Pilbara.
STATEMENTS
Cautionary Statement
All of Castle’s projects in Australia are considered to be of grass roots or of relatively early-stage exploration
status. There has been insufficient exploration to define a Mineral Resource. No Competent Person has
done sufficient work in accordance with JORC Code 2012 to conclusively determine or to estimate in what
quantities gold or other minerals are present. It is possible that following further evaluation and/or exploration
work that the confidence in the information used to identify areas of interest may be reduced when reported
under JORC Code (2012).
Forward Looking Statement
Statements regarding Castle’s plans, forecasts and projections with respect to its mineral properties and
programmes are forward-looking statements. There can be no assurance that Castle’s plans for
development of its mineral properties will proceed. There can be no assurance that Castle will be able to
confirm the presence of Mineral Resources or Ore Reserves, that any mineralisation will prove to be
economic or that a mine will be successfully developed on any of Castle’s mineral properties. The
performance of Castle may be influenced by a number of factors which are outside the control of the
Company, its Directors, staff or contractors.
Exploration - Competent Person Compliance Statement
The Company is not aware of any new information or data that materially affects the information included in
the relevant historical market announcements referenced herein.
Competent Persons Statement
The scientific and technical information in this Report that relates to the geology of the deposits and
exploration results is based on information compiled by Mr Stephen Stone, who is Managing Director of
Castle Minerals Limited. Mr Stone is a Member of the Australian Institute of Mining and Metallurgy and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Stone is the Qualified Person overseeing Castle’s exploration projects and has reviewed and approved the
disclosure of all scientific or technical information contained in this announcement that relates to the geology
of the deposits and exploration.
Page 10 of 11
Castle Minerals Limited (ASX: CDT)
Ghana Drilling Update – 20 May 2025
PREVIOUSLY REPORTED INFORMATION RELATING TO THIS RELEASE
Additional details, where applicable, can be found in the releases referenced in this Report and/or in
releases lodged by the Company with the ASX, including the following:
Headline
Date
March 2025 Quarterly Report & Appendix 5B
28 April 2025
Next Phase of Drilling to Commence at Kpali Gold Project
24 March 2025
Castle raises $3 Million to Accelerate Ghana Gold Drilling
3 March 2025
High Grade Gold intercepts Confirm Kpali Discovery
13 February 2025
Excellent Gold Intercepts From Drilling at Kandia Prospect
28 January 2015
Drilling Completed at Kpali and Kandia Gold Prospects
15 January 2025
Drilling Commences at Kpali and Kandia Gold Prospects
19 December 2024
Kpali Drilling Programme Completed and Drill-for-Equity Agreement
22 August 2024
Castle Commences Drilling at Kpali Gold Project
7 August 2024
Reprocessed Geophysics and Historical Intercepts to Drive Ghana Gold Expansion
11 June 2024
US$11.7 Million Farm-Out Agreement, Degbiwu and Gbiniyiri Licences, Ghana
14 August 2019
New Graphite Discovery in Ghana
30 July 2014
Maiden Resource Estimate for the Kpali Gold Prospect
2 July 2014
New Gold Zone Intersected at Kpali
20 March 2014
High Grade Gold Intersected at Bundi Prospect
31 January 2014
Kpali Gold Discovery
28 January 2014
Kpali Drill Results
18 January 2014
Multiple EM targets identified at Bundi Prospect
28 October 2013
Geophysical Survey Commences at Bundi and Kpali
13 August 2013
Drilling Extends Kpali Gold Discovery
4 July 2013
High Grade Gold Horizon Defined at Bundi Prospect
17 June 2013
New Gold Discovery at Kpali Prospect in Ghana
24 May 2013
RC Drilling Confirms Gold and Zinc Discovery at Bundi Prospect
23 May 2013
New 600m Long Gold Zone Defined – Kpali Prospect
20 May 2013
New Gold Hits South of Bundi Prospect RC drilling Commences
6 May 2013
Bundi Gold Target Increases to 1,400m
22 April 2013
Drilling Confirms Gold Mineralisation at Wa South and New Prospect Identified
Auger Drilling Defines Large Gold Anomaly at Wa South
Page 11 of 11
26 September 2012
19 May 2011
Share your feedback
Discover